Product Details:
Product name |
|
Model |
AS ABOVE MENTIONED. |
Size |
(Size can be customized) |
Material |
Iron+crystals |
Finish |
Gold & Chrome&Black &nickel |
Lamp Holder |
E12/E14 |
Voltage |
110V-240V |
Delivery time |
15-25 days after receieved the payment |
Packing |
The inner packaging is foam, and the outer packaging is a carton or wooden frame |
About US
FAQ
1.Can I have sample first?
Yes,Welcome to oeder 1 piece to check the quality.
2. Can you Design for us?
Yes, We have a professional design team, you only need to tell us your ideas and requirements, we will draw them out, and then give you confirmation.
3. What about the lead time for mass production?
Honestly, It depends on the order quantity and the season you place the order. The normal delivery time is around 15-30 days.
4. What if I had never bought the product from China?
We will guide you step by step.
1,Contact us, tell us your needs, such as model, size, color, quantity
2,Quote according to your needs
3,Confirm the order and pay the deposit
4,Start production, and provide photos and videos to buyers for acceptance
5,Buyer pays the balance, seller arranges delivery.
6.MOQ?
1 sample to check quality is available.
7.Port of loading?
Mainly ship from Zhongshan, Shenzhen or Guangzhou.
8. Are you a Factory or a Trading Company?
We are a Factory. We have our own design team, production department and sales team.Welcom to visit our factory.